We went on vacation the end of July. When we got back we kinda forgot to update…. I will start off slowly so you aren't overwhelmed with all the happening with the house.
Just before we left for vacation, the plumbing was completed. We also had the central air system installed. I was a bit surprised they do not create floorplans to include the HVAC system. They cut into closet space and walls to create a way for the vents to get to their intended rooms. I always thought floorplans were created with spots of the HVAC. When we got back from vacation, the electrical was complete, and they were starting on the siding. About a week after the siding was done, the exterior wall insulation was in. We had to wait about a week for inspections. During this time Brandon and I installed some sound proofing insulation in the media room, and some normal insulation in bathroom walls to keep the sound down. It turned into a big job. Also, we wired the media and family rooms for speakers. We may never get the speakers installed, (haha) but we at least have the option for later. Once the drywall went up, it started looking like a home. We could see how much space we have, and picture the house finished.
I will give another portion of the update later this weekend. So much has happened, and we have been so busy. That is part of the reason we haven't been able to keep the blog updated. Sorry, no pics this time. I'm saving those for later....